Global Wind Market Status

In recent years, the global wind market has enjoyed strong growth. In 2021, installed global wind capacity reached 835GW, up 15% from 2020. At the same time, global turbine manufacturing capacity reached almost 150GW. At the Renewables and Low Carbon Supply Chain conference on the 10th March 2022, Rystad determined that further commitment is required Read the full article…


CCUS Cluster Sequencing Phase 1, Track 1

BEIS announced the much coveted fast-track slot winners on the 1st November 2021 – Hynet in northwest (NW) England and the East Coast Cluster in the northeast (NE). A simple, but notable differentiation between the two is that the NW project is looking to reuse as much infrastructure as possible (pipelines, depleted gas fields), whereas Read the full article…


Measurement, Monitoring and Verification (MMV)

An ‘MMV’ plan for a carbon storage project must incorporate many different activities, covering both subsurface and environmental considerations. Pre-storage. A baseline must be established. This can rely on/utilise data including 3D seismic and legacy/new wells. During storage operations. Seismic and wellbore observations must be repeatable, for comparison with the baseline. This way, the evolution Read the full article…